Fundur/Andre Swanepoel Interiors
●Sanlam Cape Town HQ Fit-Out
Offline
All changes saved (04:48:44 AM)
AS
Andre SwanepoelWorkspace Owner (IID Designer)
Status:
Target: 2,200 m² Corporate Floor Plate
Budget: R 4.8M Cap
AI Cost Logged: $0.0124 (R 0.22)

Phase Documents

4 files

Upload Notes & CAD Plans

PDF, DWG, DOCX up to 50MB

Client_Discovery_Notes.docx
1.4 MBToday, 08:30
Floor_Plate_Level_4.dwg
24.8 MBYesterday
Acoustic_Guidelines_v1.pdf
3.2 MBOct 04
Executive_Brief_Summary.pdf
850 KBJust now

Structured Design Brief

Real-time collaborative brief. Edits save automatically without manual confirmation.

Synced with Neon DB

Phase Quality Gate

In Progress
Site visit and initial walk-through completedEssential for Gate Advance
Client headcount and department requirements loggedEssential for Gate Advance
Target fit-out budget and milestones confirmedEssential for Gate Advance
Meeting notes uploaded and structured brief verified
AI Assistant
Worker: Gemini 3.8 Flash
Hello Andre! I have loaded the Sanlam HQ Discovery context. Would you like me to synthesize the meeting audio into the structured brief fields?
Context loaded · $0.00